Wednesday, February 29, 2012
8.3 cummins
2/16/27/28/29 installed piston packs into engine hooked push rods up to crank installed main bearings torqued top spec. also installed crank timing gear heated to 300 degrees and installed then timed it to the cam also installed oil pump. 2/28 installed timing gear cover we had to pull the cam and oil pump and installed back of timing gear cover reinstalled the cam and oil pump installed rear crank seal and rear main oil seal. also worked on toyota forklift . 2/29 taped out oil pan drain plug and put a plug in it also installed oil pan went to asbtc and presented Denmark cd. then went and worked on toyota forklift . i have a total of 38 hours and a month total of a 151hors and 30 minutes.
88 pathfinder
2/8/12 installed wax solenoid for the idle control of the fuel injection. also adjusted idle this took 4 hours.
Sunday, February 26, 2012
compct 1120
2/13/12 adjusted fuel system and bled turned over and got smoke. also adjusted mx-3 clutch spent a total of 6 hours on this project.
ASBTC
2/22/2012 RAUL AND I spent the day researching so that we could get funding for class field trips/a bbq and funds for Denmark we are now the diesel reps for the class. with research i have spent a total of 8 hours on this.
toyota forklift
2/21/12 installed radiator changed the oil @ installed the valve covers spent a total of 3hours on this including picking up the radiator /water pump /thermostat.
1985 chevy mini wini engine swap
2/10/11/12/18/2012 we spent a considerable amount of time on this project we started by pulling the front grill and core support @ radiator pulled out the tiered 350 small block we then replaced the front seal on the turbo 400 tranny and changed the filter.we then installed a 454 big block. we found a serpentine system for it. it was quiet the project to do in a driveway but we completed the task and it runs great i spent a total of 30 hours on this project.
worker retraning and scholarship
2/9/12 and2/13/12 i went to the dislocated workers class at work source and found out that i could get a scholarship threw them. i then met with daniel reedman and was able to get all of the paper work that it takes to get the scholarship. i have a total of 10 hours worth of recherche and foot work on this project.
Friday, February 17, 2012
toyota forklift
in the last couple weeks i have been working on a toyota forklift. I cleaned and prepared surfaces for new head gaskets and intake manifold gaskets i installed heads torqued them to spec installed intake manifold/installed exhaust manifolds /distributor/pushrods /rocker arms and adjusted valve lash. i have also removed the radiator and had it cleaned and repaired
with running around and doing some research i have spent 27 hours and 30 minutes on this project.
with running around and doing some research i have spent 27 hours and 30 minutes on this project.
Wednesday, February 15, 2012
92 toyota truck timing belt
2/3/12 on this project i worked on a 92 toyota pickup. i installed new rear brake shoes i also installed a fuel filter. i also replaced the timing belt/water pump and installed a new radiator and hoses. this took a total of 14 hours with a trip to the store.
Sunday, February 5, 2012
92 mx-3 clutch
2/2/12 we spent the day removing the motor mounts axles air box battery speedometer cable and the transmission. we then removed and replaced the pressure plate clutch and throw out bearing. we spent a total of 8 hours 30 minutes on this project.
Thursday, February 2, 2012
1120 3 cyl compact tractor motor
2/1/12 worked on starting motor today. found out that u should never try to adjust the fuel system unless you are a fuel injection specialist. we also took apart one of the injectors and cleaned it we discovered that it had some sticky mechanisms we spent a total of 6 hours & 30 minutes trying to figure out the fuel.
Subscribe to: