Tuesday, January 31, 2012
looking for internship
I have spent considerable amount of time looking for an internships i went to several different diesel shops.here is a list of them motor trucks/ seiara pacific cat dealership ludkey trucking and pape machinery i spent a total of 20 hours looking for a internship so far. i have a total of 91 hours &30 minutes this quarter.
1120 3 cyl compact tractor motor
1 /31/ 12 tried to start compact motor today. trouble shot the fuel system. we finally got fuel to injectors but still did not get it to run yet. i do not have any pictures do to the fact that my phone broke today. i had a total of 6hours thirty minutes today.
ford tempo
1/27/12 ford tempo installed new exhaust from the catalytic converter back also installed new front brakes pads & rear brake shoes. i repacked wheel bearings and bleed the brakes this took a total of 8 hours.
Monday, January 30, 2012
Sunday, January 29, 2012
1120 3 cyl compact tractor motor
1/24/12 did research on the torque specs on a 3 cyl compact tractor motor . spent a total of 7 hours on this project.
cummins 8.3
replaced soft plugs in cummins 8.3 project. then hot tanked the block to clean any dab re from the block. we replaced a total of 8 soft plugs. we then measured the cam lobs journals intake 1.75 @ 2.75 exhaust 1.70 & 2.01 bearing s 2.364. then lubricated lobs and bearings with lubraplate assembly lube. installed cam. spent 8 hours on this spent another 4 hours researching 7.3 litter power stroke.
Tuesday, January 24, 2012
cummins 8.3
1/10and 1/11/12 Assembled pistons to connecting rods.first we arranged all of the parts to be installed
we put the snap ring in one side of piston and aline connecting rods with piston. we then lubricated the piston pin with 15/40 oil and connected the piston and connecting rod together. we then put piston rings on pistons be sure to be careful when installing them for they are very brittle . we made sure that the opening of the rings are 120 degrees out from one another. lubricate the piston and piston sleeve with 15/40. use a ring compressor and slowly tap piston into piston sleeve.i spent a total of 16 hours on this and research.
Tuesday, January 10, 2012
cummins 8.3
1/9/12 Started today by looking up the part numbers for the cummins 8.3. We also spent some time setting up the engine block on a engine stand. we spent a total of 5 hours on this.
cummins 8.3 project
1/6/12 started by chasing the head bolt holes and the main bearing cap bolt holes. I then spent some time researching the cummins web site. spent a total of 4 hours working.
cummins 8.3 project
1/5/12 started assembly project on a cummins 8.3 marine diesel engine. started by organizing parts for project. we spent some time researching the motor.we then spent some time cleaning up the block getting the rust and loose paint off. then we took the block and hot tanked it for a total of 30 minutes then dried the block off. spent a total of 6 hours 30 minutes.
toyota forklift
Today i started to disassemble on a toyota forklift. i am replacing both head gaskets. it has been a challenge and with going to the store and picking up a few items that i needed along the way. it has taken me 8 hours to remove the heads and another 2 hours to locate a machine shop and to deliver the heads to have them machined and a valve job done.
Subscribe to:
Posts (Atom)